Delivery of industrial CCUS clusters – Societal Readiness pilot
Liko 421 diena
Registro duomenys
- Paraiškų terminas
- 2027-12-01
- Finansavimo biudžetas
- ~30 000 000 €
- Bendrafinansavimo dalis
- Nežinoma
- Kam skirta
- Privatus ir viešasis sektorius
- Regionas
- Nežinoma
- Programa
- Horizon Europe
- Finansavimo forma
- dotacija
- Įmonės dydis
- Įmonės be dydžio apribojimo
- Tinkamos šalys
- EU
Apie kvietimą
Expected Outcome: Project results are expected to contribute to all of the following outcomes: Near-to-market solutions for the safe integration and use of CCUS technologies in the energy- and carbon-intensive industry; A pipeline of projects that have the potential for commercial scale-up. Deeper understanding of the needs and concerns of diverse social groups involved in or potentially affected by the R&I development of the technology, thereby increasing the potential for beneficial societal uptake and building trust in results and outcomes. Scope: Projects are expected to be the de-risking first step to develop local or regional industrial CCUS clusters, i.e. (multi) source and (multi) sink solutions for the decarbonisation of the hard-to-abate industries of the region. Projects are expected to be the basis and orientation for future full-size projects. To maximise the impact, projects should have a substantial industrial involvement. Projects should address most, but not necessarily all of the below issues: Detailed planning and preparation for retrofitting capture systems to existing industrial plants; Demonstrating important system components; Identification and characterisation of the clustering potential of (cross-border) regional CO2 emitters; Optimisation of industrial symbiosis between emitters and potential users of CO2; Development of tools to optimise the design and operation of the cluster(s) and operate CO2 streams with different compositions, flow rates and operating regimes to comply with the constraints for the shared transport and storage infrastructure; Identification of potential regional users of a common CO2 infrastructure (this could also include enlargement counties, such as the Western Balkans, Ukraine and Moldova); Comprehensive economic and technical assessment to identify the best (multimodal) transport options, including the re-use of existing infrastructure; Development of business models for regional CO2 transport networks, including for dispersed industrial sites to link these to larger industrial clusters or pipeline networks; Consideration of feasible CO2 geological storage services Comprehensive set of studies and preparatory actions leading to permitting; Scenarios for integrating CO2 infrastructure in (plans for) regional, national and/or cross-border energy networks (electricity, hydrogen, natural gas), also in relation to future changes in industrial landscape and energy supply mix. Projects are expected to deliver a strategy for the exploitation of results that includes plans for scalability, commercialisation, deployment, permitting procedures, and identified public and private funding sources for CAPEX and OPEX, like private equity, the InvestEU, the EU Catalyst Partnership, the Innovation Fund, and possibly the Regional Development policy funds. For CO2 capture, transport, utilisation and (in particular onshore) geological storage, public acceptability is paramount. Therefore, projects are expected to…
- innovative_technology_adoption
Šis puslapis pateikia surinktų duomenų santrauką. Prieš teikdami paraišką patikrinkite oficialiame šaltinyje galiojančias sąlygas, tinkamumo reikalavimus ir dokumentus.
Duomenys atnaujinti šiandien.
Nebeieškokite rankiniu būdu
Kam jums reikia finansavimo?
Žvalgas kasdien seka finansavimo portalus ir praneša apie jums tinkančius kvietimus.